The Challenge
The project involved the complex design of infrastructure for a new Satellite (SAT 3) facility, a critical expansion to support growing passenger capacity. The core challenge was creating a comprehensive and compliant design for all integrated services—including power, data, HVAC, and life safety systems—within a greenfield site, while ensuring seamless future connectivity to the existing airport ecosystem. This required navigating stringent aviation regulations, coordinating with multiple utility providers, and designing for both future-proof scalability and immediate operational resilience.