Explore our Blog and Newsletter

Knowledge that powers progress

Explore our case studies to discover how our expert aviation solutions have delivered real-world results

What Our Clients Say About Us

Discover how AIS delivers excellence through real-world solutions.

Our case studies showcase the challenges we’ve tackled, the innovative approaches we’ve applied, and the measurable results we’ve achieved for clients across aviation, defence, and various infrastructure sectors.

Each project tells a story of collaboration, technical expertise, and commitment to quality – proving why industry leaders trust us with their most critical developments.

Case Studies

I just want to say thank you for all your efforts in helping us to make this winter’s runway closure the most successful to date. We’ve had some excellent feedback from client visits while we’ve been out there and I’m so glad that we’ve been able to maintain everyone’s involvement in such a critical project for our client.

Oliver Dickinson
Oliver Dickinson
Allied Infrastructure – East Midlands Airport Runway works

Another huge thanks to everyone involved in the final changeover of ACOP01. A project that could have gone awry and caused real problems has, due to meticulous planning and unstinting efforts from many quarters, caused hardly a ripple. Well done everybody!

Steven Gregory
Steven Gregory
MAG – Manchester Airport

A big well done on the works.

Philip Hull
Philip Hull
Vanderlande – Pipe Diversion – Manchester Airport

SSK4 Cluster power fault is reported as resolved by AIS. Thanks to Tom AIS for his assistance.

Oliver Brooker
Oliver Brooker
Mace – Manchester Airport Transformation works

Just emailing to say that Horea Lea and MAG have come back and congratulated you on a brilliant survey on the BAM north gate survey. The report was excellent and has been recognised by all parties.

MAG/BAM
MAG/BAM
Pit and Duct Survey Manchester Airport

A massive congratulations to all involved with the successful isolation and diversion works of ACOP01 yesterday. This was a massive undertaking which involved months of planning, complex isolations, shutdown works, and a very high risk operation to maintain services to the critical C200 IT service room.

Niall Bracken
Niall Bracken
Mace Group - Airport Transformation - T2R & P2P2

Just a short note to thank you for your continued efforts across the Defence Estate for VINCI and to congratulate you on your successful Supplier Award nomination and shortlisting. Being selected in this way in testament to the service you are providing and the way we work together.

Grant Cristall
Grant Cristall
Vinci Facilities

It’s a great achievement and opens the door to the vital new works, and also allows the removal of the existing generator and tank in the East service yard. The existing ACOP was in poor condition so already we have reduced risk to the airport. Thanks so much to all involved.

Niall Bracken
Niall Bracken
Mace Group – Generator Replacement - Manchester Airport